Handover 7/29 Muraoka → Teraoka
* Fictional memo for training. All companies, staff, equipment, drawing numbers and values are fictional and not related to anything real.

Re Q3: ordering that bracket, waiting on them. Probably early Aug.
Install it on EQ-025 when it comes. Until then, if the belt runs off track, push it back by hand.
Don't touch the centering screw. Touched it before and it got worse.
Drawing is in the blue file on the office shelf. Drawing No. is written in the log,
under May.

EQ-022, the one with NG only on the 1st piece first thing in the morning: cause still unknown.
Goes away after a 5-min warm-up. Reported to TL already. QC has
asked me to "send the data", but I haven't sent the 7/23 data yet.

PM schedule: check if EQ-009 on 8/5 can be moved up.
The hydraulic issue has come up many times, so I want to check it before that.
No WO issued yet.

For the fault report from Client A, see the separate phone memo.
The lot number changed back and forth, so it's faster to check the stamp
on the actual part. SV is away on a business trip next week.

Also, the rattling on EQ-001: we replaced the part in June, but
it came back on 7/28. Maybe it is not the guide pin.
Barashi during next month's holidays.

About Tama (stock): rags and cutting oil filters are running low.
Better place an order.

* Abbreviations: TL=line leader / QC=quality assurance / PM=periodic maintenance /
WO=work order / SV=client's manager in charge / Tama=stock / Barashi=disassembly